Piling Rig Operator [United Arab Emirates]


 
  • Must have a 02-years experience
  • Drive heavy steel tubes into the ground at the right depth, filling them with concrete and then removing them, to leave the support in place
  • Drive fully reinforced, pre-cast concrete piling into the ground
  • Carry out rotary bore piling using a temporary casing and auger to drill to the necessary depth
  • Install mini piles where space is limited
  • Check equipment before it’s used and keeping it maintained
  • Work with technical plans and information
  • Identify the position of underground services (such as pipes or wires) before starting work
  • Use hoisting equipment to position piling leads and hammers

Job Type: Full-time

Experience:

  • UAE: 2 years (Required)

Expected Start Date: 19/07/2023

Sponsored Ads


 

.
Previous Post Next Post

نموذج الاتصال